WORK ORDER
WO-2026-1106
Fill out a printable work order template in minutes with this free work order generator — built for property managers, maintenance teams, and contractors assigning and tracking repair jobs. No account required.
STEP 1 OF 6
Start with the property and unit, then describe the issue clearly enough that whoever picks up the job doesn’t need to guess. Set a priority, assign it to in-house staff or a contractor, and add a schedule or contact details if the work needs coordinating. Once the job is done, record completion notes and any materials used before printing or filing the finished work order.
A tenant in Unit 4B reports a leaking kitchen faucet. The property manager creates a work order: property and unit filled in, issue described as “kitchen faucet leaking at the base, steady drip,” priority set to Normal, and assigned to the in-house maintenance tech with a note to coordinate access with the tenant. After the repair, the tech adds completion notes — “replaced worn cartridge, tested for leaks” — and the manager files the printed work order with the unit’s maintenance history.
Writing a vague issue description that leaves the assignee guessing, skipping the priority so urgent jobs get lost in the queue, leaving out contact details when the job needs tenant coordination, and never recording completion notes — which makes the maintenance history useless for the next similar issue.